TE–TO Zagreb
The purpose of the reconstruction was to replace two old hot water boilers due to their inability to achieve the required limit values of flue gas emissions while maintaining existing capacities. The location of the construction of the boilers was the existing building of the HEP TE-TO Zagreb plant on the existing foundations of the old boilers. The boilers are intended for operation in peak loads ranging from 15 to 58 MW. The Contractor's scope of work consisted of the design phase, procurement, equipment installation, warranty tests, and handover of the plant to the Investor.
-
- Client
- HEP
-
- Country
- Croatia
-
- Period
- 2016 – 2018