Projects &
References

Monting has over 2000 different executed projects, both in Croatia and around the world.

Hydrocracker Complex Rijeka

Project documentation, supply of materials, production and assembly of a steel structure with a total weight of 2,815 tons. Assembly of 302 pcs. of equipment for the Hydrocracker plant in the Rijeka Oil Refinery.
  • Client
    CB&I Lummus
  • Country
    Croatia
  • Period
    2008 – 2010

RHE Velebit

The project to replace the cooling and drainage equipment of the power plant included the supply of materials, fabrication and installation of piping, installation of equipment and commissioning of the cooling and drainage system in the engine room of the RHE Velebit power plant.
  • Client
    Končar
  • Country
    Croatia
  • Period
    2019 – 2020

Revitalization of the hot water network

The project includes the replacement of one third of the existing hot water network with modern technology of channelless laying of pre-insulated pipes of the hot water network of the central heating system of the city of Zagreb, with a total length of 68.5 km. The execution of the works is co-financed from the European Fund for Regional Development. The revitalization project began in 2021 and is the largest project in the history of the central heating system of the city of Zagreb.
  • Client
    HEP-Toplinarstvo
  • Country
    Croatia
  • Period
    Ongoing since 2021

Evonik Antwerp

Erection of pipelines and erection of the steel construction.
  • Client
    Evonik
  • Country
    Belgium
  • Period
    2014 – 2015

BASF Ludwigshafen

Erection of pipelines.
  • Client
    BASF
  • Country
    Njemačka
  • Period
    2014 – 2015

Oiltanks Žitnjak

Complete erection of 3 oil tanks – 20 000 m3 each. The project included the erection of tanks, the erection of aluminum roofs, the erection of connecting pipelines, corrosion protection, and insulation.
  • Client
    JANAF
  • Country
    Croatia
  • Period
    2015

Amine Unit Rijeka

Execution of works and commissioning of the LPG amine treatment plant (393) in the Rijeka Oil Refinery, which includes the supply of materials, pre-assembly and installation of pipelines, pre-assembly and installation of amine tanks, supply and installation of shut-off fittings, assembly of columns, vessels, exchangers, pumps and others less equipment. The project was carried out on a turnkey basis and included the connection of the process pipelines of the amine plant with NHT2 to the sour gas pipeline with the CDU and the sulfur production plant (SRU).
  • Client
    Siemens Energy
  • Country
    Croatia
  • Period
    2018 – 2019

Liquid Fuel Supply Reconstruction

Reconstruction of the liquid fuel supply system for the needs of TE-TO Zagreb. Reconstruction of the fuel oil pipeline into the extra light fuel oil system from tank R1 to the hot water boilers.
  • Client
    HEP
  • Country
    Croatia
  • Period
    2021 – 2022

GHE Senj

Delivery of stainless steel materials and installation of thermal insulation.
  • Client
    HEP
  • Country
    Croatia
  • Period
    2019

JANAF Sisak Tanks

Construction of a crude oil storage area at the Sisak Terminal - construction of the A-2512 and A-2513 crude oil tanks, each with a volume of 80,000 m3, with associated equipment and infrastructure and their connection to the existing systems of the Sisak Terminal.
  • Client
    JANAF
  • Country
    Croatia
  • Period
    2019 – 2021

Steam Block Sisak

New steam block with capacity 12,5 t/h – EPC contract. Erection of steel structure, boiler chimneys, and pipelines. Design of the main project and detailed design.
  • Client
    HEP
  • Country
    Croatia
  • Period
    2017 – 2019

TPP Šoštanj

On-site prefabrication and erection of HP turbine pipeline.
  • Client
    ALSTOM
  • Country
    Slovenia
  • Period
    2013 – 2014